Ennstone Portacabin Frame



Project : Design Fabricate and Erect Steel Frame to Support Portacabins Over Existing Office Portacabins.

Client : Ennstone Johnston PLC

Specialist Requirements The existing offices must be kept operating during all works.

Working with the structural engineers (Canham Consulting) and the Portacabin suppliers (Anglo Scottish Equipment) a design for the structure was agreed.
The structure was fabricated by our engineers at the Wymondham workshops
and sent for shot blasting and painting. The finished steelwork was delivered to site ready for erection. Erection of the structure was carried out over a weekend as the Offices had to be kept open during normal working hours. Once the structure was ready for the cabins we assisted the cabin suppliers to install the cabins, again this work was carried out over a weekend.

© Standley Steel Stockholders 2008